"vintage shasta"Shasta 1400 Upgrades
    • Public Gallery  • Help  
• Join Now!  • Log In  • Feature Tour
 Dan Hellier | Home > 
Shasta 1400 Upgrades
This Shasta is here to have a new (straight) axle put on to replace the original drop down axle.  While it is here it will have the propane system replaced, and the new owner will be doing the rest of the renovation herself.
Date(s): Jan. 2011. Album by Dan Hellier. Photos by Dan. 1 - 17 of 17 Total. 2792 Visits.
Start SlideshowTo order prints and photo-products: 1. Select photos. 2. Click Order. 3. Select products.Select images and click to download to your computerSend Email of Selected Photos 
Enlarge photo 1
1

Enlarge photo 2
2
Old drop axle removed, getting ready to install new axle & leaf springs.

Enlarge photo 3
3
Much to our surprise, the hardware for the hangers was a different than normal size, so we had to cut off the old hangers and weld on new ones.  Years ago there wasn't much standardization in trailer parts, manufactures just used whatever they had laying around.

Enlarge photo 4
4
Forward new hanger on left side.  4 new hangers total, with new hanger bolts, u-bolts etc.  Every part of the suspension was replaced.

Enlarge photo 5
5
The axle is in and the trailer is on the ground with it's new 15 inch tires.  It was too dark to take a picture.  I will tomorrow.

Enlarge photo 6
6
New axle and new wheels, the trailer sits about 5 1/2 inches taller.

Enlarge photo 7
7

Enlarge photo 8
8
The old power inlet plug was falling apart.

Enlarge photo 9
9
Weather proof cover over receptacle.

Enlarge photo 10
10

Enlarge photo 11
11
New key lock installed on fridge compartment.

Enlarge photo 12
12
New copper line from stove to new regulator on tongue

Enlarge photo 13
13
Using a flaring tool to flare the copper line where it will join the regulator.  Here you see I have place protective sheathing over the copper line.

Enlarge photo 14
14
New tank hold down threaded rod

Enlarge photo 15
15
New regulator, "pig tail hoses", regulator holding bracket, threaded tank hold down rod, and hold down bracket.  Tanks were installed only for a operation and leak check purpose.

Enlarge photo 16
16
New tongue jack

Enlarge photo 17
17
All three burners going.
End of project.


 
 Select All.  
  Sign the Guestbook. Displaying 1 of 1 entries.
Nice work. I have a 1996 Prowler that needs some attention.
 - 
Randy K. Austin, Sat, 29 Jan 2011 7:55AM
 
Album Properties. Email Album. Send Invitation. Add to Website. Share URL