Up-graded wall, all new plumbing, electrical upgrades.
Date(s): Feb, 2012. Album by Dan Hellier. Photos by Dan. 1 - 13 of 13 Total. 1102 Visits.
1
2
3 New Ceiling lights.
4
5 Wood blocking for later installation of hot water heater. Blocking in other picture is for paper towel holder.
6
7
8
9
10
11
12 City water inlet manifold. Open valve on left to fill water holding tank. Open valve on right to send city water directly to the faucets and water heater.
13 New 120 volt water pump, pressure switch, 2 low point drains.