• Public Gallery  • Help  
• Join Now!  • Log In  • Feature Tour
 Patrick & Susan - Their Journeys | Home > Perpetua activies > 
Spring Projects 2008
This time period was from February through March. I fixed some dry rot around the toggles that hold the forward wet lockers down. Then I prepped and painted the inside of the pilot house. This was a signifcant project as it had been on my list for 10 years! This also signified that no other more important projects had popped up. Once the pilot house was completed work started on the replacement of the engine exhaust injection pipe and installing a new engine temperature gauge. Both of these projects were related to the engine overheating issue. Hopefully this will fix this issue!
Date(s): March 18 2008. Album by Patrick & Susan - Their Journeys. Photos by Perpetua's Crew. 1 - 16 of 16 Total. 520 Visits.
Start SlideshowTo order prints and photo-products: 1. Select photos. 2. Click Order. 3. Select products.Select images and click to download to your computerSend Email of Selected Photos 
Enlarge photo 1
1
Hatch Toggle dry rot.

Enlarge photo 2
2
Get rid of the rot and prep for fiber glass.

Enlarge photo 3
3
Apply wood plug, epoxy filler and glass.

Enlarge photo 4
4
All done!

Enlarge photo 5
5
Plug old instrument hole and prep Pilot house for painting.

Enlarge photo 6
6
Area Primed.

Enlarge photo 7
7
More prep work.

Enlarge photo 8
8
The corners are prepped too!

Enlarge photo 9
9
Let the paint flow!

Enlarge photo 10
10

Enlarge photo 11
11

Enlarge photo 12
12

Enlarge photo 13
13

Enlarge photo 14
14
All Done!

Enlarge photo 15
15
Replaced engine exhaust injection pipe to solve the engine overheating issue.

Enlarge photo 16
16
Installed a new engine cooling water temperature gauge. Upper left of picture.

 Select All.  
  Sign the Guestbook. There are no entries.
 
Album Properties. Email Album. Send Invitation. Add to Website. Share URL