Pat went down to work on the boat during November and December. He had to reinstall the deck hard ware, fix fiberglass cracks, remove the head ports (being replaced) and prepare the head interior wood for painting/oiling. Plus many other smaller projects.
Date(s): November 1, 2005. Album by Patrick & Susan - Their Journeys. Photos by Perpetua's Crew. 1 - 18 of 18 Total. 408 Visits.
1 Deck hardware reinstalled. Main sail track shortened, less turning blocks and padeyes.
2 Ceilings back up down below, first time in a year!
3 Ceilings back up. Port side.
4 Chaos rains below while work progresses on deck.
5 Workers were hired to paint the inside of the hulls. Of course all the gear had to be removed first!
6 Fiber glass work.
7 Port head window removed and fiber glass work on the right.
8 Starboard head window removed and additional fiber glass work around the port hole.
9 Fiber glass yeah!
10 Starboard window area all Fiber glassed and being faired in.
11 Starboard window area from inside. Cork around window has been removed.
12 Port window area all Fiber glassed and being faired in.
13 Port window area from inside. Cork around window has been removed.