 1 The mechanical area was well thought out and we take great pride in the way we install all of our systems.This is a high efficiency condensing boiler with a Turbomax instant water heater and Hydro-air handler to the left.
|  2 All of our primary supply and return headers are piped in black iron pipe.In the foreground is the propane gas header.
|  3 It takes a little more time to make the job look like this but we think the job speaks for itself.
|