1
This is how the kitchen was set up when we first moved here in 1984. The hook up for the gas stove was beside the doorway leading into the dining room.

Enlarge photo 2
2
Back door leads into a sort of woodshed. It was cold!
There were no cupboards along the north wall on the left side of the pic.


Enlarge photo 3
3
Our new microwave sits on a 3 drawer dresser in front of the full size north window. We later put in cupboards all along this wall and made the window smaller and put the sink in front of it.
It's 2007 as I write this, and we are still using this same microwave.


Enlarge photo 4
4
In 1984 the sink backed onto the wall shared by the basement steps as you can see by the brown door.The white door in the far background is our front door.

Enlarge photo 5
5
Our kitchen table and chairs were in this corner until we put on an addition at the back of the house in 1991. The window in this pic no longer exists because the wall became an interior wall after the renovation. The back door is to the left.

Enlarge photo 6
6
Insulation and siding added to east side of house May/03

Enlarge photo 7
7
August 2007
Old interior cedar door. Aluminum storm door has been removed.


Enlarge photo 8
8
August 2007
Decorative screen door and insulated metal door installed


Enlarge photo 9
9

Enlarge photo 10
10
This light has not functioned for some time. It will be coming down.

Enlarge photo 11
11
May 2007
Starting removal of east section of planter to make way for flagstone patio


Enlarge photo 12
12
First steps in clearing area for installation of flagstone patio.
May 2007


Enlarge photo 13
13
Trees have been removed

Enlarge photo 14
14
Old railway ties removed.

Enlarge photo 15
15
Removing old soil.
Planter partially removed. Basement window in background will be covered over.


Enlarge photo 16
16
Joey driving Bobcat

Enlarge photo 17
17

Enlarge photo 18
18

Enlarge photo 19
19

Enlarge photo 20
20

Enlarge photo 21
21
Mike disposing of those nasty footings,lol. Try as he might, he just couldn't break them up with a sledge hammer. Joey took care of them with the Bobcat!

Enlarge photo 22
22
Joey loading cement pieces onto our truck

Enlarge photo 23
23
Sept.7 2007
Work starts on patio


Enlarge photo 24
24

Enlarge photo 25
25

Enlarge photo 26
26

Enlarge photo 27
27
Sept.9  2007

Enlarge photo 28
28
Sept.13
Screening down, ready for cement


Enlarge photo 29
29
Sept.13
Cement truck arrives


Enlarge photo 30
30
Cement is mixing

Enlarge photo 31
31
First pour

Enlarge photo 32
32
Pouring and spreading cement

Enlarge photo 33
33
Cement base all poured

Enlarge photo 34
34
Cement base poured and curing

Enlarge photo 35
35
Sept.17
First half of flagstones set in place


Enlarge photo 36
36
Sept.19
Stonework done.


Enlarge photo 37
37
Stonework done..new skirting needed on porch

Enlarge photo 38
38
View of south side

Enlarge photo 39
39
First planter for new deck...a large chrysanthemum.

Enlarge photo 40
40
Sept.28
Smaller mums placed on south steps


Enlarge photo 41
41
Sept.28
Shrub rose called "Home Run" to be planted beside south door


Enlarge photo 42
42
January 31  2008
Energy efficiency testing.
A second test will be done within 18 months for comparison after insulation and siding are installed on south side of house, new windows are added and other improvements.


Enlarge photo 43
43
February 14  2008
Work has started on installing 3 new windows and adding vinyl siding to the south side of the house.


Enlarge photo 44
44
One new bedroom window added.
All second storey windows have now been replaced.


Enlarge photo 45
45
Strapping on south side
February 14  2008


Enlarge photo 46
46
Insulation added Feb.15  2008

Enlarge photo 47
47
Wrap installed over insulation and start of siding
February 26  2008


Enlarge photo 48
48
New umbrella and patio set added to flagstone patio. Rose bush is in a temporary container until stone planter along house is finished. Flagstones will be coated with a sealer after a couple small repairs are done to the grout work.

Enlarge photo 49
49
Mike working on building new planter around house.
July 2008


Enlarge photo 50
50
Close up of new stones used to replace old ones of previous planter wall

Enlarge photo 51
51
Planter along front of house. We added 3 yew trees and red geraniums.
July/August 2008


Enlarge photo 52
52
June 25  2013
New roofing being installed on house.


Enlarge photo 53
53
June 25  2013

Enlarge photo 54
54
June 26  2013

Enlarge photo 55
55
June 26  2013
A big job finished in 2 days.


Enlarge photo 56
56
October 31  2013
Septic tank cleanout and drain tiles routed.


Enlarge photo 57
57
Oct.31  2013
Septic tank cleanout truck.
Discount Drain, London


Enlarge photo 58
58
April 2014
Adding Polarfoam insulation to walls of front crawl space.


Enlarge photo 59
59
April 2014
Foam insulation truck