Memorial Garden Pathway
Work began in late 2015 to replace the crushed granite pathway in the Memorial Garden with paving blocks. Due to a later than anticipated start, work will not be completed until the spring of 2016.
Date(s): 2015 Winter/2016 Spring. Album by Albacore. Photos by Various. 1 - 21 of 21 Total. 401 Visits.
Start SlideshowTo order prints and photo-products: 1. Select photos. 2. Click Order. 3. Select products. 
Enlarge photo 1
1
100 0878 Edit
Initial excavation and removal of crushed granite material from the pathway. Edit

Enlarge photo 2
2
100 0881 Edit
Work on the pathway was delayed until after the  Wreaths Across America ceremony held in early December.. Edit

Enlarge photo 3
3
100 0882 Edit
All the old walkway material has been removed. Note the Albacore Shipmate Memorial Block Pathway to the right leading to the flag pole. Edit

Enlarge photo 4
4
100 0887 Edit
The compacted base for the new pathway has been laid down. Edit

Enlarge photo 5
5
100 0888 Edit
Blocks are placed around the fenced dolphin area. Edit

Enlarge photo 6
6
100 0889 Edit
Blocks stacked up ready for placement. Edit

Enlarge photo 7
7
100 0891 Edit
New pavers surround the flag pole in the Garden and mate up with the Albacore Shipmate's Memorial Block walkway. Edit

Enlarge photo 8
8
100 0893 Edit
Long view of the pathway leading to the former fountain site at the south end of the Garden. Edit

Enlarge photo 9
9
100 0894 Edit
View toward the newest memorial in the Garden. Edit

Enlarge photo 10
10
100 0903 Edit
View of pathway showing the start of the trimming of pavers and the placement of edging blocks. Edit

Enlarge photo 11
11
100 0906 Edit
Pavers in place leading up to the former fountain site. Edit

Enlarge photo 12
12
100 0907 Edit
A long view of the paving effort. Edit

Enlarge photo 13
13
100 0908 Edit
Pavers and edging blocks give the pathway a finished look. Edit

Enlarge photo 14
14
01-07-16 (1) Edit
The first snow fall of the 2015 winter brought work to a halt. Edit

Enlarge photo 15
15
01-07-16 (2) Edit
Work will resume when the ground has thawed. To be added is a plastic edging with steel spikes along the entire periphery to retain the walkway shape. Edit

Enlarge photo 16
16
01-07-16 (3) Edit
The edges will be backfilled with loam and seeded. Edit

Enlarge photo 17
17
01-07-16 (4) Edit
To finish the job, the walkway will be compacted to set and level the pavers and the joints between pavers filled with sand and compacted again. Edit

Enlarge photo 18
18
2016 [03-09] (23) Edit
On 9 March, the block retainers were installed that hold the path shape, the blocks leveled and preparations were made for inserting super sand between the blocks. Edit

Enlarge photo 19
19
05-03-16 (1) Edit
Looking into the Memorial Garden from the entrance. Edit

Enlarge photo 20
20
05-03-16 (2) Edit
View looking toward the flag poles and monuments. Edit

Enlarge photo 21
21
05-03-16 (3) Edit
Looking toward the Visitor;s Center building from the southern end of the Memorial Garden. Note that grass is beginning to grow along the side of the walkway. Edit

 