Saarinen Building - Former TWA Building Technically In Terminal 5 JFK Airport
C: Robbyn Stewart Customer Service Coordinator Airport Operations Division 718-244-4157 direct 917-567-3733 cell rstewart@panynj.gov
NOTES: - There are 4 lanes in front of the building, trucks/vehicles can go there. Mandatory that one lane is kept clear for thru traffic. - Ticketing and baggage claim are off limits - Rooms on 1st floor and 2nd floor are off limits - Bar/lounge areas on second floor are restricted. Need to have an environmental inspection before filming/prep work. The building has not completed that aspect for that portion of the building and since it is a little run down, the presence of any hazardous material or safety hazards is unknown. If we want to film up here or if any crew plans on being up here (including camera position), need to have in detailed LOI and do environmental inspection. - There are two other companies we need to get in touch with should we film there: one for the engineering and logistics (deals with AC, lighting, security/alarm system control, etc...) of building and one for cleaning (hauling trash off site and properly cleaning the building after we wrap out. Robbyn didn't know the price of their prices. - No use of gorilla tape is permitted - No drilling holes or penetrating into the building's infrastructure is whatsoever is permitted. - Any heavy equipment in building = protection. IE, camera/lighting needs to be on top of protection and not directly on the tiled floor. - Minimum 3 week application and approval process. - Working restrooms (men and women) - No working elevator - Cannot control timetables - they are active. Can try asking Robbyn again, but she seemed pretty firm on not being able to control them. - Connecting tubes are TWA until wall break. Cannot go past that boundary.
Date(s): June 27, 2014. Album by wc6. Photos by KTS. 1 - 138 of 138 Total. 19 Visits.
1
2 Exterior - front of building
3
4 Exterior - North
5
6 Exterior - South
7 Exterior of building - front - facing West
8
9 Exterior - South
10 Exterior North from south end of building
11 Exterior - North
12 North
13 South
14
15
16 2 of 4 sets of doors to enter building
17
18 1st floor up entering - north end of building
19
20
21 South end of 1st floor
22
23
24
25 West side of building facing towards East side of building
26 Facing west side of building
27
28
29 1st floor - waiting area
30
31
32
33
34
35
36
37
38
39
40 Southeast end stairs to 2nd floor
41 Reverse - southheast end stairs at second floor
42 Southeast side of 2nd floor facing south
43
44 2nd Floor - south end of building
45
46
47
48
49
50
51
52
53
54
55
56
57
58 Bridge on 2nd floor to north side side of building
59
60
61
62
63 North end 2nd floor
64
65
66
67
68
69
70
71
72
73
74 Northend bar area - 2nd floor
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93 South stairs - back to 1st floor
94 south lobby area
95
96
97
98 south end - connecting tube - goes to Jet Blue terminal
99
100 north end lobby 1st floor
101
102
103
104 North end lobby area
105
106 North end connecting tube - identical to south end connecting tube - also goes to Jet Blue
107
108
109
110
111
112
113 2nd set of stairs to second floor - on front end/west side of buiding. There are 4 total - 2 in front and 2 in back of building