 1 HOUSING LICENSE 2025
|  2 HOUSING LICENSE 2026
|  3 Schoolhouse Apartments Boonton, NJ
|
 4 Apartment 1 - RENTED Custom kitchen with exposed brick walls.
|  5 Kitchen with SS appliances "I love the red brick - adds so much ..." View Comments...
|  6 Pantry, left, with kitchen, right. Doorways lead to dining room/office.
|
 7 Dining room/Office Pantry entrance, center. Kitchen entrance, left.
|  8 Bathroom off of bedroom/living room closet doorway to kitchen
|  9 Bathroom
|
 10 Living Room/Bedroom Flex floor plan two closets
|  11 Apartment 2 - RENTED left of the fridge is the SS sink, with window above, and the SS dishwasher
|  12 Apartment 2 upper level, right side Front View W/ Driveway "Beautiful Building. Nice work on the..." View Comments...
|
 13 stair treads lead you to this upstairs unit
|  14 kitchen wall with tall window to the right of the SS fridge
|  15 storage cabinet under tall window to the right of the SS fridge
|
 16 SS stove with SS microwave oven
doorway leads into the bedroom
|  17 living room
original refinished oak floors "So warm and inviting!" View Comments...
|  18 close-up of SS sink and quartz countertops with tiled backsplash
|
 19 bathroom
|  20 view from the bedroom, through the kitchen, and into the living room
|  21 Apartment 4 bottom floor, right side
|
 22 Apartment 4 - RENTED Renovations begin on Oct. 1, 2025 and were completed in December 2025.
First step, removal of wall-to-wall carpeting.
|  23 Hallway into living room hallway closet, right bathroom door, beyond
|  24 Bedroom before renovations old carpeting being removed getting ready for new flooring
|
 25 Front entrance door, hallway, French doors to bedroom
|  26 Bedroom French doors from inside the bedroom
|  27 Bedroom view from bedroom to hallway French doors have been added new flooring is in hallway has been renovated
|
 28 Bedroom view from hallway to bedroom
|  29 Living Room before old carpeting being removed getting ready for new flooring
|  30 living room and hallway
|
 31 living room renovations
|  32 living room left, bathroom door right, kitchen
|  33 Back door entrance. Divider wall is being removed to enlarge the kitchen and create a dinette area.
|
 34 Divider wall is being removed.
|  35 The divider wall has been removed so renovations can begin.
|  36 View from dinette area into the kitchen and exterior wall.
|
 37 view from dinette area work in the kitchen continues
|  38 kitchen close-up of quartz countertop, SS sink and faucet quartz backsplash being installed soon! SS dishwasher being installed soon!
|  39 the backsplash is in
|
 40 Interior kitchen wall - before.
|  41 Back door entrance into dinette area. Interior kitchen wall being renovated.
|  42 View from dinette area. Interior kitchen wall being renovated.
|
 43 Interior Kitchen Wall SS refrigerator SS microwave oven SS gas range quartz countertop quartz backsplash being installed soon!
|  44 the backsplash is in
|  45 View from kitchen to dinette area. The kitchen cabinets arrived!
|
 46 View from living room through kitchen and to dinette area and back door.
| |