Decided it was time to hook up my shop to the boiler. That way I can get the add on wood furnace out of there which will open up some space. Not having the wood supply in there will mean more space as well. I wanted to shop around to bundle all me insurance and found most all companies refuse to insure a shop building with a stove even if it is UL listed as mine was. Here we go.
Album by Kevin Foust. 1 - 38 of 38 Total. 10462 Visits.
Start SlideshowTo order prints and photo-products: 1. Select photos. 2. Click Order. 3. Select products. 
Enlarge photo 1
1
Here is an old pic of the boiler house where the het source is and the shop. What I have to do is run the lines under the floor, through the foundation walls on a slow sweeping curve. The pipe is really stiff and can only be bent in about an 8 foot circle.

Enlarge photo 2
2
I built the building so it could be taken apart easily to get the stove out if need. You have to lift from above so everything was screwed together and I used cathedral trusses.

Enlarge photo 3
3
I drained the stove to get rid of the extra weight. Hoses come in underneath and you can see the ones currently going to the house and attached garage. I lifted the stove with the backhoe and set it on 4 car skates and pushed it back out of the way. If you look close you can see I have cut the 6 inch thick floor for the line hole. I need a good bit of space to work.

Enlarge photo 4
4
There is 1/2" rebar in there as well so I'll get some quality time with a sledge hammer and rotary hammer. I could have just cut a slot in the floor but I don't want the floor to be messed up.

Enlarge photo 5
5
Chipping away at it. Literally.

Enlarge photo 6
6
All that is out so time to start digging.

Enlarge photo 7
7
Did  BUNCH of measuring and decided where the exit hole should be for height and length. I need an 8 inch diameter hole for the pipe. I dug outside down to the depth I needed. I marked that on the footer wall and started drilling. Didn't want to spend thousands to have some come and core drill this. The footer wall is 16 inches thick so not fun.

Enlarge photo 8
8
This took quite a while to do and it was extremely hot while doing it but I got it. Now the real fun part. I have to use a hand held auger and drill horizontally and try to get the holes to line up.

Enlarge photo 9
9
It was just about 12 foot under the floor and made an extension for the auger. I triangulated the angles to figure what angle was needed and laid a straight edge to keep that right. I was VERY relieved when it finally broke through and I hit it perfectly. Got Lucky I guess. I'm using field tile as a liner so if needed, I can always replace the heat lines.

Enlarge photo 10
10
Very good feeling to have that in place and done. I'll mix up some concrete and seal the outer diameter later.

Enlarge photo 11
11
Here you can see the tile run better.

Enlarge photo 12
12
From there I dug the trench to the shop. Ground was extremely hard so I cheated and used the auger to dig down to the depth I needed. Just had to shave the rounded corners of the ditch.

Enlarge photo 13
13
I painted the grass to where I wanted to go through the shops foundation and floor.

Enlarge photo 14
14
This shows my cheating. LOL

Enlarge photo 15
15
Shops foundation was done in the 1920's- 1930's. That footer went down 36 inches and about 12 inches wide. Thing was they back filled concrete with larger rocks. As luck would have it, Several Granit rocks had to be busted where a needed to enter. LOL Took about a whole day to get them out.

Enlarge photo 16
16
Once the hole was through the wall and I had enough of a gentle sweep up, I put the field tile in. I then used a fishtape and pulled a rope through to help pull the pipe.

Enlarge photo 17
17
Here is the heating pipe. Has a harder outer layer and inside are 2 one inch pipes that are incased in closed cell foam. The same kind of foam like Great stuff and insulates really well.

Enlarge photo 18
18
Here you can see the pipes and how it enters in the shop.

Enlarge photo 19
19
I drilled a hole through both pipes and stuck a bolt through and this is what the rope attached to in order to pull. O did not want it slipping off midway.

Enlarge photo 20
20
I tried to find the fittings I needed but was unable to without a bunch of bulk stepdowns. I wanted stainless or brass. Found an old stainless pump shaft I had and will make them from this.

Enlarge photo 21
21
Cut the ends off and will hold from both ends to get what I want.

Enlarge photo 22
22
Drilled the through holes first then turned the diameters to size, I also did some reliefs/barbs for the hose to grip better. This system has very little pressure but overkill is good.

Enlarge photo 23
23
I'm using a large truck radiator for a heat exchanger so I needed to neck down from a radiator hose to the 1 inch.

Enlarge photo 24
24
here is the radiator I'm using. I don't want to mount it completely solid. Gives me some adjustment and play. I came up with using 2x4's with a slot groove that will ride on the edges of the core. Loose but secure. You can see the groove on the edge of the 2x4 at the bottom.

Enlarge photo 25
25
Went to the scrap yard and found some heavy aluminum angle. Will work very nice for this. Wood will just slide in and I'll run screws through the side to lock it in place.

Enlarge photo 26
26
The lower limit rests on the end tank. I gave it about 2 inches of upward allowance. The wood is at upper/lower limits here.

Enlarge photo 27
27
I used bevel headed fasteners on to edges as I will lag bolt into wall studs and ceiling trusses. That way, it's all out of the way up high.

Enlarge photo 28
28
Lower limit.

Enlarge photo 29
29
Upper limit.

Enlarge photo 30
30
Now I need to mount the pipe to the wall with a standoff. Has to be kind of stout and I found some really nice clamps at the scrap yard.

Enlarge photo 31
31
These will work really nice. Got some box tubing to mount to the wall. I drilled a hole in the middle of the clamp and that will attach to the box tubing.

Enlarge photo 32
32
Makes a very clean install.

Enlarge photo 33
33
So far so good. I'll add another once I get the radiator in place.

Enlarge photo 34
34
Use the shipping cap as a cover on the end. Just made 2 holes for the pipes to slip through.

Enlarge photo 35
35
Got it all mounted up and the hoses on.

Enlarge photo 36
36
I mounted a normal box fan on the back. Plan is to have the thermastat below and when heat is needed, the fan will run.

Enlarge photo 37
37
All the upper work is finished now.

Enlarge photo 38
38
Mixed up some concrete and filled the hole in. I waited a couple days then cut the tile flush with the floor.

 