 Completed cage setup; top 3 cages in use.
|  Supplies and a couple of corrugated plastic bases in place; hardware cloth on back & sides of bottom half-attached with cable ties to frame of shelving & stapled to wood shelves on each level.
|
 Top shelf with corrugated plastic base and acrylic window in place
|  Simba: veggie-time; enjoying new cage! (Water bottle attached with small bungee cords & 1 hole cut through hardware cloth for nozzle.)
|
 Hardware cloth (wire) attached around sides & back of shelving; bottom 2 shelves corrugated plastic; photo shows 1 cage completed.
|  Simba in hammock
|
 Grid-panels used to close off front of self cage attached with cable ties to each other & frame of utility unit. White fleece attached w/carpet tape to center of corrugated plastic base; bedding on each side.
|  Cube grid "doors" attached with cable ties to frame as "hinges".
|
 Nala enjoying new cage for the first time. Acrylic window fronts attached inside frame of unit & taped along bottom.
|  Nala's bottom shelf cage completed; cube-grid "doors" secured tightly with cable tie.
|