During the winter of 1995, I tore my Bombardier down to the bare belly pan. A total rebuild was done with all wearable parts replaced. The Hydraulic system was upgraded to 20 gpm at 3000 psi for future needs. The Engine is a Chrysler 251 Industrial. Steel was added on the rear to mount a Braden HU-8 Hydraulic Winch. A 3 Point mount was built to mount a AmeriEquip 80A Backhoe. The same 3 point mount accepts a Valby chipper that will handle up to 4 inch logs.
Date(s): 1995 Rebuild of Bombardier. Album by Power Wagon. 1 - 16 of 16 Total. 4193 Visits.