 1 PA020001
|  2 PA020002
|  3 PA020003
|  4 PA020004
|
 5 PA020005
|  6 PA020006
|  7 PA020008
|  8 PA020009
|
 9 PA020010
|  10 PA020011
|  11 PA020012
|  12 PA020013
|
 13 PA020014
|  14 PA020015
|  15 PA020016
|  16 PA020017
|
 17 PA020018
|  18 PA020019
|  19 PA020020
|  20 PA020021
|
 21 PA020022
|  22 PA020023
|  23 PA020024
|  24 PA030021
|
 25 PA030023
|  26 PA040003
|  27 PA040007
|  28 PA040084
|
 29 PA040085 New dual wall 12" plastic meets old clay on property line. 8" breather will be installed too.
|  30 PA040088
|  Download WMV
31 PA040090.wmv Speicher wheel machine starting out.
|  32 PA040091
|
 33 PA040092 New main slowly moves to the side of the old one. T will be for new 6" sub main but for now will allow old line to drain into new one.
|  34 PA040100
|  35 PA040101
|  36 PA040102
|
 37 PA040103
|  38 PA040107
|  39 PA040108 Tapping old laterals into new main.
|  40 PA040111 Old laterals are tied in and marked with GPS.
|
 41 PA040114
|  Download WMV
42 PA040116.wmv Speicher backfiller running.
|  43 PA050001 20'sticks of 12" smooth bore dual wall pipe.
|  44 PA050005
|
 45 PA050007
|  46 PA050009
|  47 PA050012
|  48 PA050022 Much easier than the way they installed the old clay main.
|
 49 PA050025
|  50 PA050026
|  51 PA050034
|  52 PA050036
|
 53 PA050049
|  54 PA050057
|  55 PA050067
|  56 PA050088 Gaining additional fall and depth with new 12" main.
|
 57 PA050097 Flags mark lateral size and how it was attached. Clean old laterals were tied directly into the new main or sub main. Old laterals 3/4 or more full of mud were still wicked into the main by attaching a short piece of plastic which was laid along the new main and covered with gravel.
|  58 PA050103
|  Download WMV
59 PA060006.wmv 6" Sub main going in.
|  Download WMV
60 PA060007.wmv Speicher wheel machine full throttle Detroit.
|
 61 PA060008
|  62 PA060011
|  63 PA060017 New 12" main was installed on one side of the old main. Search ditch and 6" sub main was installed on the other side of the old main to catch and tap in any old laterals.
|  64 PA060018
|
 Download WMV
65 PA060019.wmv Close up of Speicher wheel machine digging.
|  Download WMV
66 PA060039.wmv Speicher wheel machine putting in 6" sub main.
|  Download WMV
67 PA060041.wmv Close up of Speicher wheel machine digging.
|  68 PA060049
|
 69 PA060059
|  70 PA060077
|  71 PA060082 Temporary tie in of old main to new.
|  72 PA080003
|
 73 PA080023
|  74 PA080024
|  75 PA080051 Pre-exisiting riser/inlets along lane were tied into new system.
|  Download WMV
76 PA080054.wmv Speicher backfiller running #2.
|
 77 PA080061
|  78 PA080062
|  79 PA080064
|  80 PA080069
|
 81 PA080074
|  82 PA080081
|  83 PA080090 (2)
|  84 PA080100
|
 85 PA080101
|  86 PA080118
|  87 PA090067
|  88 PA090071 8" breather/inlet installed on property line where new main meets old main.
|
 Download WMV
89 PB290013.wmv Plowing through and breaking old clay main.
|  Download WMV
90 PB290018.wmv Plowing through and breaking old clay main #2.
|  Download WMV
91 PB290059.wmv Plowing through and breaking old clay main #3.
|  Download WMV
92 PB290062.wmv Close up plowing through and breaking old clay main #4.
|
 93 PB300002
|  94 PB300007
|  95 PB300011
|  Download WMV
96 PB300013.wmv Plowing in new 4" laterals with Wolfe tile plow.
|
 Download WMV
97 PB300014.wmv Plowing in new 4" laterals with Wolfe tile plow #2.
|  Download WMV
98 PB300015.wmv Plowing in new 4" laterals with Wolfe tile plow close up.
|  99 PB300021
|  100 PB300024
|
 101 PB300026
|  102 PB300029
|  103 PB300030
|  104 PB300033
|