Memorial Garden Pathway
Work began in late 2015 to replace the crushed granite pathway in the Memorial Garden with paving blocks. Due to a later than anticipated start, work will not be completed until the spring of 2016.
2015 Winter/2016 Spring21 Images6957 visitsAlbum by AlbacorePhotos by Various
Enlarge photo 1 100 0878
Initial excavation and removal of crushed granite material from the pathway.
Enlarge photo 2 100 0881
Work on the pathway was delayed until after the  Wreaths Across America ceremony held in early December..
Enlarge photo 3 100 0882
All the old walkway material has been removed. Note the Albacore Shipmate Memorial Block Pathway to the right leading to the flag pole.
Enlarge photo 4 100 0887
The compacted base for the new pathway has been laid down.
Enlarge photo 5 100 0888
Blocks are placed around the fenced dolphin area.
Enlarge photo 6 100 0889
Blocks stacked up ready for placement.
Enlarge photo 7 100 0891
New pavers surround the flag pole in the Garden and mate up with the Albacore Shipmate's Memorial Block walkway.
Enlarge photo 8 100 0893
Long view of the pathway leading to the former fountain site at the south end of the Garden.
Enlarge photo 9 100 0894
View toward the newest memorial in the Garden.
Enlarge photo 10 100 0903
View of pathway showing the start of the trimming of pavers and the placement of edging blocks.
Enlarge photo 11 100 0906
Pavers in place leading up to the former fountain site.
Enlarge photo 12 100 0907
A long view of the paving effort.
Enlarge photo 13 100 0908
Pavers and edging blocks give the pathway a finished look.
Enlarge photo 14 01-07-16 (1)
The first snow fall of the 2015 winter brought work to a halt.
Enlarge photo 15 01-07-16 (2)
Work will resume when the ground has thawed. To be added is a plastic edging with steel spikes along the entire periphery to retain the walkway shape.
Enlarge photo 16 01-07-16 (3)
The edges will be backfilled with loam and seeded.
Enlarge photo 17 01-07-16 (4)
To finish the job, the walkway will be compacted to set and level the pavers and the joints between pavers filled with sand and compacted again.
Enlarge photo 18 2016 [03-09] (23)
On 9 March, the block retainers were installed that hold the path shape, the blocks leveled and preparations were made for inserting super sand between the blocks.
Enlarge photo 19 05-03-16 (1)
Looking into the Memorial Garden from the entrance.
Enlarge photo 20 05-03-16 (2)
View looking toward the flag poles and monuments.
Enlarge photo 21 05-03-16 (3)
Looking toward the Visitors Center building from the southern end of the Memorial Garden. Note that grass is beginning to grow along the side of the walkway.