PrevNext StopPlayPause  sec delay 
Return to Album
Monday 11/7 - work resumes on the front
This is the front first floor leftmost window - the other one that had a rotten frame and needed to be replaced. The window frame and these studs were replaced immediately after this picture was taken (they had to take the outlet apart to get the studs out.)
Panasonic DMC-FZ1 Full EXIF / IPTC
Photo 178 of 410, sm_RottenStudsUnderFrontDRWindow.jpg, 62KB, 640x480, 13 Hits
Other Sizes: Medium Original
Properties | Link Back to Thumbnails