Stage This
Sun valley Has availability SUN VALLEY: https://stagethisla.com/stage/sun-valley/ SUN VALLEY Rates
Build- $1,800/12- Includes Truck Lot, production supplies (attached),17 extra crew spots, power, 1 scissor lift, stage manager- Does not include: AC.
Shoot/ Prelight Package B- $3,500/13 hours- Includes Truck Lot, production supplies (attached), 17 extra crew spots, power,1 scissor lift, stage manager, space-lights, AC, 25 walkies (no headsets)- with this package you can bring in your own gear at no extra cost.
Shoot/ Prelight Package A- $5,500./13 hours- Includes Truck Lot, production supplies (attached), Crew Lots, power,1 scissor lift, stage manager, space-lights, AC, 25 walkies (no headsets), 5 TON COMBO TRUCK
Prelight- A La Carte (No AC, Walkies, 12 hours only)- $2,850. Extras: $250 - Parking-additional 35 spots crew per day $350- Cleaning and sanitization $600- Paint-ONLY if you need the cyc/ floor pristine white $3.5 k Custom Paint- 3 walls plus entire floor Digi Blue: $3,600.-$450. each x 8- (5 Gallon Buckets) $480. ($120. x 4 ) Primer $1,440. ($120 x 12 white to restore) $750. Labor (2 coats white to cover) $150. Delivery $6,420.
HILL STREET https://stagethisla.com/stage/hill-street/ 2 WALL CYC.jpg HILL: Build- $1,900/12- Includes Truck Lot, production supplies, power, 1 scissor lift, stage manager- Does not include: AC
Shoot/Prelight- PACKAGE B $3,750/13 hours (Package B)- Includes Truck Lot, production supplies, power,1 scissor lift, stage manager, AC, 2 stage areas, support rooms- corkage for outside gear is waived. ( No walkies at Hill Street location)
Additional 1 time CostAdded to Stage Fee:
$350- Cleaning and sanitization $600- Paint- Pristine White/ Cyc A $350- Paint- Pristine White/ Cyc B *Custom Colors are quoted based on color/area
Extras/Options:
$600- 60 Crew Spots/ 1/2 block walk $350. AC $450/ HR OT
** Hill is not a a rated stage, Local Permit Policies Apply. Private Property/Locked and Gated (Stills permit costs $100) | Album by Kieron Estrada. 1 - 16 of 16 Total. 48 Visits. |
|