PrevNext StopPlayPause  sec delay 
Return to Album
Pinjarra Road below
The 272 metre connection took just over 6 mths to reach the southern embankment, with 36 launches in total. More than 5,500 cubic metres of concrete and 815 tonnes of reinforcement was used for the bridge decks and combined, the two structures weigh approx 15,500 tonnes.
All Images are Copyright ©gladysclancy
Photo 7 of 29, IMG_7484.JPG, 78KB, 799x599, 144 Hits
Other Sizes: Medium Large
 Back to Thumbnails