Pinjarra Road below The 272 metre connection took just over 6 mths to reach the southern embankment, with 36 launches in total. More than 5,500 cubic metres of concrete and 815 tonnes of reinforcement was used for the bridge decks and combined, the two structures weigh approx 15,500 tonnes. | |
All Images are Copyright ©gladysclancy Photo 7 of 29, IMG_7484.JPG, 78KB, 799x599, 144 Hits Other Sizes: Medium Large | |
Back to Thumbnails |