Twin Spans over the Murray River The twin structures are the longest on the project at 272 metres and were constructed using an incremental launch method to allow traffic on Pinjarra Road to continue to flow, and to lessen the construction impact on the environmentally sensitive river area. | |
All Images are Copyright ©gladysclancy Photo 3 of 29, IMG_7479.JPG, 76KB, 799x599, 133 Hits Other Sizes: Medium Large | |
Back to Thumbnails |