Kids Building Planes 2020
Activities during 2020.
Album by John Cronin. 1 - 78 of 78 Total. 364 Visits.
Start SlideshowTo order prints and photo-products: 1. Select photos. 2. Click Order. 3. Select products.Select images and click to download to your computerSend Email of Selected Photos 
Enlarge photo 1
1
January 6th, 2020. First session is pulling staples from side one of rib one.

Enlarge photo 2
2
Trimming the rear of rib.

Enlarge photo 3
3
It's a start. Still have to apply gussets to the other side.

Enlarge photo 4
4
RS534 was missing from the shipment. Those are for certain gussets on the horizontal stabilizer and elevator. I am making my own using plywood from my Pietenpol project.

Enlarge photo 5
5
Second session is marking the locations for gussets on side two of the first rib.

Enlarge photo 6
6
Now gluing those gussets.

Enlarge photo 7
7
Third session is working on the RS534's I needed to make (that were missing from the kit).

Enlarge photo 8
8

Enlarge photo 9
9
They will fit just fine.

Enlarge photo 10
10
Fourth session is making gussets for the horizontal stabilizer.

Enlarge photo 11
11

Enlarge photo 12
12
Sixth session is gluing the first side of rib #2.

Enlarge photo 13
13
Started drilling holes for the bolts (for hinges) in the trailing edge of the horizontal stabilizer.

Enlarge photo 14
14
Zach is rounding the edges of the gussets of the first rib.

Enlarge photo 15
15
Here's Zach make a piece for the center of the horizontal stabilizer.

Enlarge photo 16
16
Floyd is cutting notches in some pieces to fit in the horizontal stabilizer center section.

Enlarge photo 17
17

Enlarge photo 18
18
1/27/20 Ben about to drill two holes into the center of the horizontal stabilizer. They have to be dead on because bolts go through to hold the vertical stabilizer.

Enlarge photo 19
19
Yay! The holes lined up!

Enlarge photo 20
20
Giancarlo removing staples.

Enlarge photo 21
21
Luke gluing a piece for the aft area of the horizontal stabilizer center section.

Enlarge photo 22
22
Adelamaria gluing the tip. This will be the first gusset glued to the horizontal stabilizer.

Enlarge photo 23
23

Enlarge photo 24
24
Chris is starting on the other end.

Enlarge photo 25
25
2/3/20 Zach using a file to remove excess glue and gusset edges. He just finished the corners of the gussets.

Enlarge photo 26
26
Floyd removing staples.

Enlarge photo 27
27
Luke and Giancarlo gluing the center section of the horizontal stabilizer.

Enlarge photo 28
28

Enlarge photo 29
29
Now they are gluing gussets on a rib.

Enlarge photo 30
30
Chris marking the location for hinge slots on the leading edge of the elevator.

Enlarge photo 31
31
Adelamaria gluing gussets on a rib.

Enlarge photo 32
32
Chris drilling pilot holes for the first hinge slot. We will then use a dremel tool to clean it out and make the slot.

Enlarge photo 33
33

Enlarge photo 34
34
Floyd removing staples from gussets on the top of the horizontal stabilizer.

Enlarge photo 35
35
Luke drilling pilot holes for the hinge slot of the elevator.

Enlarge photo 36
36
Anthony gluing gussets on a rib.

Enlarge photo 37
37
Julia marking gusset locations on a rib.

Enlarge photo 38
38
Giancarlo gluing gussets on a rib.

Enlarge photo 39
39
Luke gluing gussets on a rib.

Enlarge photo 40
40
Luke gluing a gusset on the bottom of the horizontal stabilizer.

Enlarge photo 41
41
Giancarlo gluing a gusset on the bottom of the horizontal stabilizer.

Enlarge photo 42
42
2/24/20. Ben and Luke about to glue the bottom forward gusset on the horizontal stabilizer.

Enlarge photo 43
43
We removed the horizontal stabilizer. Getting ready to start the elevator.

Enlarge photo 44
44
Chris and Adelamaria start work on the elevator.

Enlarge photo 45
45
March 2nd. Anthony pulling staples from horizontal stabilizer.

Enlarge photo 46
46
Luke sanding the horizontal stabilizer.

Enlarge photo 47
47
Giancarlo sanding the horizontal stabilizer.

Enlarge photo 48
48
Giancarlo cutting some wood which will be the rib nose template.

Enlarge photo 49
49

Enlarge photo 50
50
Rib nose glued to board.

Enlarge photo 51
51
Starting to cut near the line.

Enlarge photo 52
52
Drilling last two holes.

Enlarge photo 53
53
Next, to cut out the center area.

Enlarge photo 54
54
March 9th. Zach placing/marking gussets on rib #7.

Enlarge photo 55
55
Riven and Zach starting rib #8.

Enlarge photo 56
56
Floyd sanding the gussets of rib #6.

Enlarge photo 57
57
Luke gluing gussets to rib #7.

Enlarge photo 58
58
Julia marking gusset locations on rib #8.

Enlarge photo 59
59
Julia sanding gussets on the horizontal stabilizer.

Enlarge photo 60
60
Giancarlo sanding gussets on the horizontal stabilizer.

Enlarge photo 61
61
Giancarlo sanding the back edge of the rib nose template.

Enlarge photo 62
62
Trimming close to the line.

Enlarge photo 63
63
Chris sanding the nose rib template to the line.

Enlarge photo 64
64
Nov 23..Covid threw a wrench in the works. We are trying to get up and running again. Still working on ribs and starting the elevator.

Enlarge photo 65
65
Nov 30. Starting to lay out the elevator.

Enlarge photo 66
66
Working on ribs.

Enlarge photo 67
67
Dec 8th...working on the large center gusset for the elevator.

Enlarge photo 68
68

Enlarge photo 69
69
Ribs.

Enlarge photo 70
70
Cutting notch in the leading edge of the nose rib template.

Enlarge photo 71
71
Ribs again.

Enlarge photo 72
72
12/21...Saige working on pieces for the elevator.

Enlarge photo 73
73

Enlarge photo 74
74
Giancarlo also working on the elevator pieces.

Enlarge photo 75
75
Luke working on a rib.

Enlarge photo 76
76

Enlarge photo 77
77
12/28...still ribs....