Esholt STW Installation of ChannelMag
The following pictures show the 2 x CM24" flat electromagnetic open channel Flowmeter being installed at Esholt STW. The meter was required as the exisiting flume - whilst accurate under normal flow - would back-up if there was a downstream obstruction, the level would rise without flow, which was then seen as a high flow rate and the plant would be overtreated. The meter was installed in 3 hours from start to finish and worked accurately without commisioning or any further adjustments | Date(s): August 1, 2003. Album by David Gerrard. Photos by David Gerrard. 1 - 15 of 15 Total. 0 Visits. |
|