 | 1.
Various TCBC events of the 2004 Season (Nov. 1, 2003 - Oct 31, 2004)Photos from various Twin Cities Bicycling club rides and events during the 2004 season
Copyright © 2004 by Phil Doi. All rights reserved. |
| 11326 Visits 176 Images Shared Album | |
|
 | 2.
California Bay Area By Bike - 2004 (April 2-11, 2004)Apr 2-5: Palo Alto Apr 6-8: San Francisco Apr 9-11: Walnut Creek
Copyright © 2004 by Phil Doi. All rights reserved. |
| 4782 Visits 166 Images Shared Album | |
|
 | 3.
Gateway Trail & Hwy 96 Bridge (May 17, 2004)Photos of the bridge during construction. It goes over Highway 96 so that users on the Gateway Trail can pass overhead this busy roadway.
7/31/04: The bridge was dedicated today! 7/21/04: The Gateway Trail bridge over Hwy. 96 is completed! The bridge itself has an arched concrete surface with railings, and the connections to the existing trails at each end are nicely blacktopped and there is really no need to slow down (except for other trail users, of course).
There is also a small parking lot off Hwy. 96 under the bridge for maybe 10-15 cars, and a satellite there too. |
| 2528 Visits 24 Images Shared Album | |
|
 | 4.
Spring Jerry Loomis Mtn Bike Weekend (May 14-16, 2004)Spring 2004 Jerry Loomis Mountain Bike Weekend Cable, Wisconsin Riding the CAMBA mtn bike trails Leaders: Bob & Karen Bryan
Copyright © 2004 by Phil Doi. All rights reserved. |
| 2215 Visits 28 Images Shared Album | |
|
 | 5.
Velo Trempealeau - Spring 2004 (June 4-6, 2004)Three days of great bicycling weather on the country roads of Trempealeau County in Wisconsin. Not a single traffic signal on the routes during the three days of about 150 miles of bicycling! Leaders: John Murphy, Ron Plinske, Kristine Poelzer. |
| 3586 Visits 34 Images Shared Album | |
|
 | 6.
Velo Trempealeau Fall 2004 (Sep. 17-20, 2004)Based out of the City of Trempealeau, Wisconsin this year. Leaders: Kristine Poelzer, Ron Plinske, John Murphy |
| 3520 Visits 46 Images Shared Album | |
|
 | 7.
Midtown Greenway (Phase 2) (October 2004)Phase 2 Opens to the Public Saturday November 6, 2004 @ 3:00pm.
Photos of the Midtown Greenway (Phase 2) in progress. Crews paved Phase 2 of the Midtown Greenway from 5th Avenue South to 28th Street South the week of Oct 20th, 2004.
11-03-04 Also enclosed are some computer drawings of the Midtown Greenway bridge over Hiawatha programmed for construction in 2006/2007. This project is being funded with Federal and Hennepin County funds to facilitate a safer crossing. The City of Minneapolis will maintain the bridge. The design firm prepared the drawings to help us visualize what the bridge would look like.
THANKS to Don Pflaum of the City of Mpls for providing this photo update. |
| 1545 Visits 11 Images Shared Album | |
|
 | 8.
2004 Halloween Ride (October 30, 2004)TCBC Halloween Ride Thank you to Lisa Austin and Julie Van Mersbergen for hosting the rest stops in their homes and Thank you to Hugh Gitlin and Julie Van Mersbergen for leading and organizing this ride. About 60 riders had a great time on this ride. This year's ride started at Harriet Island in Saint Paul. |
| 3076 Visits 57 Images Shared Album | |
|