PrevNext StopPlayPause  sec delay 
Return to Album
Roof to wall asembly: Outlined earlier, tar paper folds up wall 3-5 inches,  18 Inch piece of peel and stick is applied over that, and stuck to wall sheathing. Shingles are run up till they butt into the P&S. Metal flashing is applied, and a cosmetic layer of shingles is glued to flashing.

WRB counterflashes entire assembly.
okoboji images
Canon EOS Digital Rebel Full EXIF / IPTC
Photo 95 of 224, IMG_5732.JPG, 59KB, 640x427, 374 Hits
Other Sizes: Medium Original
Properties | Link Back to Thumbnails