Roof to wall asembly: Outlined earlier, tar paper folds up wall 3-5 inches, 18 Inch piece of peel and stick is applied over that, and stuck to wall sheathing. Shingles are run up till they butt into the P&S. Metal flashing is applied, and a cosmetic layer of shingles is glued to flashing. WRB counterflashes entire assembly. | |
okoboji images Canon EOS Digital Rebel Full EXIF / IPTC Photo 95 of 224, IMG_5732.JPG, 59KB, 640x427, 376 Hits Other Sizes: Medium Original | |
Properties | Link | Back to Thumbnails |