PrevNext StopPlayPause  sec delay 
Return to Album
12 Inches of pea rock added, and ready for dirt fill.
"Is the treated plywood nailed to the treated mudsill along with the poly attached at same location? is the plywood just for extra protection for when you pour our outside slabs?" --David, 07/26/12
okoboji images
Canon EOS Digital Rebel Full EXIF / IPTC
Photo 55 of 224, IMG_5560.JPG, 78KB, 640x425, 407 Hits
Other Sizes: Medium Original
Properties | Link Back to Thumbnails