Garage AWWF foundation panels in place, and being backfilled with pea rock. The cost of filling with pearock vs gravel, amounts to about $12-15 per load for materials, and trucking is the same. Kind of a no brainer, when you think about installing 6 inch lifts, leveling out, running plate packer, skid loader sitting still with operator twiddling thumbs ( repeat the above about 8 times from footings up) while all this is being done. | |
okoboji images Canon EOS Digital Rebel Full EXIF / IPTC Photo 58 of 224, IMG_5571.JPG, 80KB, 640x425, 408 Hits Other Sizes: Medium Original | |
Properties | Link | Back to Thumbnails |