PrevNext StopPlayPause  sec delay 
Return to Album
Here we are climbing from the main level to the upper level, where the gasketing goes from the top plate of the main level, up the partition stud on the knee wall, across the top of the wall,and back down the partition stud to join onto the bottom plate of the uper level. Again, continuity.
okoboji images
Canon EOS Digital Rebel Full EXIF / IPTC
Photo 182 of 224, IMG_59893.JPG, 51KB, 427x640, 364 Hits
Other Sizes: Medium Original
Properties | Link Back to Thumbnails