 1 Baby Surprise Jacket 100% wool tapestry yarn, about size 3T
|  2 CICChainLink
| 
3 NoSwatchMittenInstructionsJGifford.pdf
| 
4 SwirlingConfettiSocksPattern.pdf
|
 5 Socks for CIC Knitted in May and June
|  6 Socks for CIC Toddler sized socks, sport weight yarn, knitted for "Children in Common" charity.
|  7 Knitalong project "Sixth Sense" socks from Six Sox Knitalong group
|  8 Capelet "lace" close up Stitch Diva Studios "Casual Glamour Capelet" Noro Cash Iroha (Silk, wool, cashmere, nylon)
|
 9 Capelet front Stitch Diva Studios "Casual Glamour Capelet" Noro Cash Iroha (Silk, wool, cashmere, nylon)
|  10 Toddler raglan sweater "Big Mexiko" self striping worsted (Schoeller/Stahl)
|  11 GreenBabySweaterYoke
|  12 GreenBabySweater1
|
 13 iPodSock
|  14 Finished! 2/7/05 Can't say much for the color in this flash photo, but the Rogue is finished!
|  15 HoodUnfinished 2/7/05 Right side worked to top, on holder. Left side worked to top, still on final needle, ready to graft to right side. Back hood stitches on holder, ready to graft to finished cable section.
|  16 Sleeves, up and down Sleeves, completed, knitted in the round.
|
 17 Knitting sleeve in the round, 1/17/05 Worked on 3 DP needles to very near the top of the patterned section (about 55 stitches on needles). At that point, switched to 16 inch circular needle
|  18 Underside of sleeve, knitted in round Rather than adding stitches at what would have been the "end" stitches of straight knit "rows", I added the stitches one stitch "in" from that theoretical edge, or a stitch away from my centerline marker.
|  19 Rogue, 3 wk progress, 1/15/05 Body finished, ready to start hood. Front and back finished to shoulders, shoulders grafted together.
|  20 Neckline ready for hood Right and left neckline stitches on holders, center live stitch held on waste yarn.
|
 21 Rogue, progress two weeks 1/9/05 Body completed to armholes, upper back completed, upper front completed to split for neckline.
|  22 closeup, beginning neck/hood panel
|  23 Side cable
|  24 Kangaroo pocket, completed
|